Mercedes W202
+ 1.2. The general data
+ 2. Maintenance service
+ 3. Engines
+ 4. Greasing system
+ 5. Cooling system
+ 6. Heating, ventilation
+ 7. Ignition system
- 8. Fuel system
- 8.1.1. Introduction
8.1.2. A fuel tank
8.1.3. The gauge of level of fuel
8.1.4. The fuel pump
8.1.5. The fuel filter
8.1.6. The air filter
8.1.7. A cross-section pipe of the air filter
8.1.8. An inlet gas pipeline
8.1.9. A cable of gas / the lever throttle заслонки (DB)
8.1.10. A cable of management of gas (DB)
8.1.11. A contour of fuel of the diesel engine
8.1.12. Prestarting heating of diesel fuel
8.1.13. The fuel thermostat
8.1.14. The hydrovalve case
8.1.15. A cable of gas / the lever throttle заслонки (ДД)
8.1.16. A cable of management of gas (ДД)
+ 8.2. System of injection of petrol engines
+ 8.3. System of injection and a food of diesel engines
+ 8.4. System of release of the fulfilled gases
+ 9. Transmission
+ 10. A running gear
+ 11. A steering
+ 12. Brake system
+ 13. A body
+ 14. An electric equipment
+ 14.2. Electroschemes
|
THE DIESEL ENGINE IN VOLUME OF 2,0 L
Removal
PERFORMANCE ORDER |
1. Remove an inlet gas pipeline. |
2. Disconnect from the storage battery a weight wire.
The prevention The anticreeping code of radio is thus erased.
|
3. Remove a candle накаливания the cylinder 3. |
4. Remove a hose of giving of a cooling liquid (87), preliminary having weakened and having moved back a collar of fastening (87/1). |
5. Remove bringing топливопровод (88), preliminary having weakened and having shifted back a collar of fastening (88/1). |
6. Remove топливопровод (89). For this purpose deblock a high-speed shutter. |
7. Unscrew a bolt (13а) on the fuel pump of atomizers. |
8. Unscrew 3 bolts (86/1) on the holder. |
9. Unscrew the thermostat (86). |
10. Unscrew a hollow bolt (86/2). |
11. Wring out from the thermostat a hollow bolt. |
|
Installation
PERFORMANCE ORDER |
1. Press a hollow bolt into the thermostat, at damage replace a sealing ring of round section. |
2. Establish the thermostat. |
3. Twist a hollow bolt. |
4. Twist bolts (86/1), (13а). |
5. Pull топливопровод, at damage replace a sealing ring of round section. |
6. Pull bringing топливопровод and fix its collar. |
7. Pull a hose of giving of a cooling liquid and fix its collar. |
8. Establish a candle накаливания the cylinder 3. |
9. Establish an inlet gas pipeline. |
10. Attach to the plug of the storage battery a weight wire. |
11. Establish time for hours. |
12. Enter an anticreeping code of radio. |
13. Start the engine and leave it to rotate idling. Check up tightness of all connections. |
14. Check up level of a cooling liquid, if necessary add it. |
|
THE DIESEL ENGINE IN VOLUME 2,2 / 2,5 L
Removal
PERFORMANCE ORDER |
1. Remove an inlet gas pipeline. |
2. Disconnect from the storage battery a weight wire.
The prevention The anticreeping code of radio is thus erased.
|
3. Twist a bolt (42) on a wire well. |
4. Remove топливопровод (90/2). For this purpose deblock a high-speed shutter. |
5. Remove a fuel hose (90/1), preliminary having weakened a collar and having shifted it back. |
6. Unscrew fixing bolts (60/2). |
7. Take the fuel heat exchanger (60) together with the thermostat. Merge in a suitable vessel a following cooling liquid. |
|
Installation
PERFORMANCE ORDER |
1. Establish the fuel heat exchanger together with the thermostat and new consolidation (60/3) and screw with the moment 10 Н.м. (Rough value). |
2. Spread топливопровод, at damage replace a sealing ring of round section. |
3. Spread the fuel pipeline and fix its collar. |
4. Establish an inlet gas pipeline. |
5. Attach to the plug of the storage battery a weight wire. |
6. Expose time for hours. |
7. Enter an anticreeping code of radio. |
8. Start the engine and leave it to rotate idling. Check up tightness of all connections. |
9. Check up level of a cooling liquid, if necessary add it. |
|
|
|