1. Check up engine support, hoses of a cooling liquid, топливопроводы and маслопроводы on porosity and presence of cracks, in case of need replace them. |
2. Check the radial ball-bearing коленвала and the persistent bearing of coupling on ease of rotation, and the coupling bearing on легкоподвижность. |
3. Check, whether the thickness and what condition of overlays of a frictional disk of coupling is sufficient. |
4. If separated, attach a transmission to the engine and enter them together into a motor compartment. |
5. At installation the engine should be lowered cautiously not to damage a leading shaft, coupling and a body. |
6. Twirl the bolts connecting the engine and a transmission. |
7. Bolts of fastening of forward bearings twirl manually. |
8. Bolts of fastening of a back arm of the engine tighten with the moment 45 Н.м., and nuts – with the moment 70 Н.м.* |
9. Screw up bolts of forward bearings of engines with the moment 30 Н.м. |
10. Remove a jack and disconnect a cable from the engine. |
11. Establish in a transmission карданный вал.* |
12. Screw конвектор on the average туннеле.* |
13. Screw on a check point a lateral support газовыпускного устройства.* |
14. If the engine acted in film without a transmission, establish a starter. |
15. Screw "a weight" wire between a starter and a body. |
16. Connect electric wires to a starter. |
17. Screw the gauge of number of turns (L3).* |
18. Screw the tachometric inductive gauge if it is. |
19. An automatic transmission: connect to a check point the lever mechanism of switching and insert an element of connection of wires of switches of blocking of start and a tail light (S 16/1). Establish an element of connection of wires of magnetic valve Kickdown on the right party of a transmission. Check up mechanism adjustment переключения.* |
20. Screw a hydraulic hose of the gauge of coupling, remove air from the gauge сцепления.* |
21. A mechanical transmission: establish rods of plugs on handles of switching of a transmission and fix clips. Check up adjustment. |
22. An automatic transmission: screw маслопроводы air маслоохладителя. |
23. Remove clips for hoses. |
24. Level adjustment: screw masloprovody/маслошланги on the delivery oil pump. |
25. Fasten hydraulic hoses сервонасоса with the moment 30 Н.м. |
26. Connect all electric wires, that is, свеч накаливания, штеккер the thermoswitch, a wire of the generator of a three-phase current, the gauge of level of oil and the switch of pressure of oil. |
27. Strengthen a phase wire in the holder over a starter. |
28. The conditioner: fasten with the moment 25 Н.м. The refrigerating compressor. Establish ridge клиновой a belt. |
29. Establish a radiator. |
30. Put on all hoses of a cooling liquid and fix communications. |
31. Check up antifreeze presence in a cooling liquid and fill in. |
32. Screw a final collector on a flange of tap of an exhaust pipe. |
33. Connect плюсовой a cable (Х4) to подсоединительному to an element located at the left in the bottom of the car. |
34. Establish the bottom cover of a motor compartment. |
35. Lower the car. |
36. Establish a cable of management of gas and adjust it. |
37. Insert draught into an engine cowl. |
38. Screw a forward cross-section basic beam with распоркой. |
39. Insert топливопроводы according to the marks put on them. |
40. Screw a hose of depression for the braking amplifier on the vacuum pump. |
41. Put on all hoses of depression which conduct to the engine. |
42. Check up oil level in a box, in case of need add it. |
43. Fill in hydraulic oil for the steering amplifier, remove air from the amplifier. |
44. Clean the air filter, if necessary replace it. |
45. Establish the air filter. |
46. Establish an air hose. |
47. Connect "a weight" wire to the battery. |
48. Finish the engine to working temperature, check up level of a brake liquid and check tightness of all elements of connection of hoses. |
49. To close an engine cowl, pull the lock lever at the left hinge and slowly lower a cowl while the lever will not be fixed. |