Mercedes S-class W202

1993-2000 of release

Repair and car operation



Mercedes W202
+ 1.2. The general data
- 2. Maintenance service
   + 2.1.1. The engine
   2.2. In addition through each 60 000 km of run
   2.3. Every 2 year
   2.4. Every 3-4 year
   - 2.5. Works on maintenance service
      + 2.5.1. The engine and system of release of the fulfilled gases
      + 2.5.2. A box predach/the main transfer
      + 2.5.3. The forward bridge / a steering
      + 2.5.4. Tyre Brakes /
      - 2.5.5. The Body / internal illumination
         2.5.5.1. Nozzle replacement пылезадерживающего the filter
         2.5.5.2. Cowl greasing
         2.5.5.3. Check of seat belts
         2.5.5.4. Hatch greasing
   + 2.6. Care of the car
   2.7. Start of the engine from the auxiliary accumulator
   2.8. Car towage
   2.9. Car lifting
   2.10. The tools applied to maintenance service
+ 3. Engines
+ 4. Greasing system
+ 5. Cooling system
+ 6. Heating, ventilation
+ 7. Ignition system
+ 8. Fuel system
+ 9. Transmission
+ 10. A running gear
+ 11. A steering
+ 12. Brake system
+ 13. A body
+ 14. An electric equipment
+ 14.2. Electroschemes







2.5.5.4. Hatch greasing
THE GENERAL DATA

The necessary special tool:

 – Two aligning bolts which can be made independently on the sizes specified in drawing;
 – cпециальные pincers or the similar tool.

Necessary quickly spent materials:

 – Antifrictional paste of Megsedes-Benz 001 989 1451 or similar.
PERFORMANCE ORDER
1. Open on 3/4 hatch.
2. Unhook in front from spring clips a covering of the shifted panel of a roof of a body.
3. Completely open the hatch.
4. Take upwards a hatch covering.
5. Unscrew screws with crosswise шлицем (arrows) and remove directing lath.
6. Close the hatch.
7. Unscrew at the left and on the right nuts (arrow).
8. Take upwards the hatch.
9. Blow compressed air a spillway from above to the left and on the right upwards.
10. Check up floating колодки on absence of damages, if necessary replace them.
11. Clear floating колодки and grease with their antifrictional paste.
12. Clear directing laths, grease a working surface.
13. Insert aligning bolts (arrow) at the left and on the right into aligning aperture.
14. Insert from above the hatch. Spread nuts, without tightening them hardly.
15. By means of the special pincers represented in drawing preliminary clamp the hatch and then hardly tighten nuts.
16. Open the hatch.
17. Screw directing lath.
18. Insert and fix spring clips a hatch covering.